Planning For Your Waterfall Project

Written by Ron Given, Aqua Control Technical Support & Waterfall Sizing Expert   3HP Niagara 2 Sled Mount Waterfall  Waterfall projects present various challenges that are not encountered with display units.  When selecting a fountain, the pattern dimensions, based on horsepower are automatically supplied.  There are no unknowns.  The patterns have been tested and measured.  … Continued

"... I tell everyone in this industry Aqua Control holds the torch for the rest of us to follow. The integrity of Aqua Control shines as a light for all others to follow when the question arises, what should we do next? The right thing as always demonstrated by your company. "


Wayne Bell
ClearWater Engineering, LLC

6A Wolfer Industrial Dr, Spring Valley, IL 61362

(815) 664-4900 / [email protected]

800-377-0019